Export Development Bank Headquarters

Project Location: Tehran
Client: Export Development Bank of Iran
Project Status: Completed
Activity Period: 1385 SH
Equipment Count: 5 units

Project Description

The Tamkin Foulad Asanbar team installed and commissioned five panoramic elevators in this complex, operating at 3 meters per second and incorporating advanced technology.

A distinctive feature of these elevators is the Destination Control system. Passengers enter their destination on a panel in the entrance lobby. Before they reach the elevators, the control system calls the most suitable elevator based on its travel route.

Read more about this system in the articles section of our website.

Project Gallery