Tehran Metro-Line 2
Location of the project:تهران
Employer Name:شهرداری تهران
project status:doing
سال فعالیت: | 1388 |
---|---|
تعداد تجهیزات: | 85 |
Tehran Metro Line-2 is 24.6 km with 22 stations. This line starts from the Farhangsara station located in Javadieh neighborhood of Tehran Pars, at the intersection of Tehmari St. and Festival St. and in front of Farhangsera Eshraq, and extends to Sadeghieh station located on the southwest side of the Sadeghieh square.
Know More
In this line, 85 escalators have been installed and operated by the technical team of Tamkin Foulad Asanbar.
User comments