Imam Khomeini International Airport

Project Location: Tehran
Client: Ministry of Roads and Urban Development
Project Status: Completed
Activity Period: 1385 SH – present
Equipment Count: 77 units

Project Description

As the airport expanded in 1387 SH, the company entered the project’s second phase by installing Iran’s longest moving walkways. Because of the limited space in the pits, these walkways were manufactured using a distinctive technical solution and installed by the company’s technical team.

In Shahrivar 1393 SH, the bridge connecting Phases 1 and 2 was repurposed and opened as a temporary Hajj terminal. Four moving walkways were installed on this bridge, bringing the combined length of moving walkways to 365 meters.

The company currently operates and maintains all elevator, escalator, and moving-walkway equipment at Imam Khomeini Airport City, comprising 39 elevators, 29 escalators, and nine moving walkways.